Oakland County and Macomb County Brick Paver Installation Company.

The most important step in a new brick paver installation is the base preparation. When starting the installation process walkways and patios should be dug out at least 7 inches and filled with 21AA compacted every 2 to 3 inches. Slag sand is then used to level the project 1 to 2 inches maximum, 2 NS sand can be used as a substitute. This will insure the life of your project for years to come. However driveways should be dug out at least 12 inches for vehicle traffic. Once the base is leveled brick pavers are now layered and the soldier course, which are the end units, are held together with a cement restraint and sand is put on top for the final compaction to lock the brick pavers in place.